CIP – Management

CIP – Management

Success is the result of continuous improvement.

  • Optimization of a MDF plant of 275.000m3 / a over 320.000m3 / a and halving the reject rates
  • Reduction of non-First Quality Products in a melamine plant by more than 60%
  • Halving the thermal energy costs in a PB / OSB plant in Europe within 6 months
  • Introduction of CIP organization in a number of European plants
  • Optimization of a European particleboard plant with several melamine lines and worktop manufacturing
  • Turnaround of a European MDF location with 2 MDF lines
  • Production optimization of laminate flooring production

Our current projects:

Middle East: Coaching a HPL location